Goulds Pumps 3796 i-FRAME - IOM User Manual

Page 47

Advertising
background image

When you pour the grout, remove air bubbles from it by using one of these methods:

• Puddle with a vibrator.
• Pump the grout into place.

5. Allow the grout to set.

1

7

6

2

3

4

5

1.

Baseplate

2.

Shims or wedges

3.

Grout

4.

Foundation

5.

Sleeve

6.

Dam

7.

Bolt

6. Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48 hours.

1

5

4

2

3

1.

Baseplate

2.

Grout

3.

Foundation

4.

Dam

5.

Bolt

7. Tighten the foundation bolts.

Installation (Continued)

Model 3796 i-FRAME Installation, Operation, and Maintenance Manual

45

Advertising