Goulds Pumps 3796 i-FRAME - IOM User Manual

Page 36

Advertising
background image

d) Make sure that the center jackscrews do not touch the foundation surface yet.

1

2

3

4

1.

Jackscrew

2.

Baseplate

3.

Foundation

4.

Plate

3. Level the driver mounting pads:

NOTICE: Remove all dirt from the mounting pads in order to make sure that you achieve the
correct leveling. Failure to do so can result in equipment damage or decreased performance.

a) Put one machinist's level lengthwise on one of the two pads.
b) Put the other machinist's level across the ends of the two pads.
c) Level the pads by adjusting the four jackscrews in the corners.

Make sure that the machinist's level readings are as close to zero as possible, both lengthwise and
across.
Use the baseplate-leveling worksheet when you take the readings.

1

2

3

4

5

6

1.

Machinist's levels

2.

Driver's mounting pads

3.

Foundation bolts

4.

Jackscrews

5.

Grout hole

6.

Pump's mounting pads

4. Turn the center jackscrews down so that they rest on their plates on the foundation surface.
5. Level the pump mounting pads:

NOTICE: Remove all dirt from the mounting pads in order to make sure that you achieve the
correct leveling. Failure to do so can result in equipment damage or decreased performance.

a) Put one machinist's level lengthwise on one of the two pads.
b) Put the other level across the center of the two pads.
c) Level the pads by adjusting the four jackscrews in the corners.

Make sure that the machinist's level readings are as close to zero as possible, both lengthwise and
across.

Installation (Continued)

34

Model 3796 i-FRAME Installation, Operation, and Maintenance Manual

Advertising