Signing-off the mx2800 atp checklist – ADTRAN MX2800 M13 User Manual

Page 168

Advertising
background image

A-12

61200290L1-1G

Appendix A, Acceptance Test Procedure

MX2800 M13 Multiplexer User Manual

9. SIGNING-OFF THE MX2800 ATP CHECKLIST

Use

Table A-1

to identify the MX2800 configuration, identify tests performed, etc.

Table A-1. MX2800 ATP Checklist

Acceptance Test Procedure Steps

Completed

Verifying the Installed Options

Dual Power Supplies / Dual Power Feeds

Dual Power Supplies / Single Power Feed

Single Power Supply / Dual Power Feeds

Single Power Supply / Single Power Feed

Dual Controllers

Single Controller

Configuring the System

Accessing the Craft Port

Provisioning the DS3 Port

Provisioning the DS1 Ports

Alarm Relay Configuration

Verifying the Data Integrity

DS1 Daisy-Chain to DS3 (Hard) Loopback

DS1 to DS3 “Head-to-Head” Test

DS1 to DS3 (Hard) Loopback

Verifying Alarm Notification

Critical Alarm Relay Test

Noncritical Alarm Relay Test

Verifying System Redundancy

Redundancy Tests (Power Supply and Power Feed as appropriate)

Controller Card Redundancy Test

Autonomous Alarm Reporting

Restoring Default Settings

Configuring the System for Traffic Readiness

NAME: DATE:

LOCATION: RELAY

RACK: