Chapter 2 Preparation of Embroidery Machine

BES-962BC • BES-1262BC

27

Lift forks

The central seal

Embroidery machines should be installed only
by trained engineers.

Electric wiring should be laid by your distribu-
tor or electric experts.

The sewing machine weighs more than 720 kg.
The installation should be carried out by a lift
or a crane.

Do not connect the power source until installa-
tion is completed. Doing so may start the ma-
chine unintentionally through an accidental
activation of the START switch, resulting in
bodily injuries.

Install a machine in a place away from a high-
frequency welding machine or other machines
that may generate a strong electric noise. Fail-
ure to do so may cause the embroidery machine
to malfunction.

Be sure to connect the ground. If the ground
connection is not secure, you run a high risk of
receiving a serious electric shock, and problems
with correct operation may also occur.

Secure the machine with the adjustment bolts
on the sound floor so that it will not move .

2. Installation

* After installation is completed, get the power supply from a dedicated outlet.
* When connecting multiple machines, exercise care not to exceed the capacity of the outlet.

2-1 Transportation of Machine

When relocating the machine, push the steel frame.

Note) Never push the cover or carriage.

When using a fork lift

DANGER

Viewing the machine from the back, position their center at the central seal, insert the forks
under the legs and lift the machine.