Charge check / hprv, Charge check / hprv -46, Torque sequence -46 – JLG 18RS Service Manual User Manual

Page 136: Auxiliary pads -46, High pressure relief valves -46, Cover screw torque -46

Advertising
background image

SECTION 5 - HYDRAULICS

5-46

– JLG Lift –

3121284

6.

Install the thrust washer (K500). Coated side goes
toward charge pump coupling (K200).

7.

Install a new cover gasket. (K150). If removed, install
guide pins (K450).

8.

Install the auxiliary pad or charge pump cover and cap
screws. Using a 8mm internal hex wrench, torque the
cap screws (K400) to 92 N•m [68 lbf•ft]. Torque in
sequence below.

9.

Reinstall auxiliary pump or pad seal (K250) and shipping
cover ((K300).

Charge Check / HPRV

REMOVAL

1.

Using a hex wrench shown in the table below, remove
the HPRVs (L150). Remove and discard the O-rings
(L060) and backup rings (L068).

INSPECTION

1.

Inspect the sealing surfaces in the pump for nicks or
scratches. Check the valves for damage. Replace any
damaged components.

REASSEMBLY

1.

Lubricate and install new backup rings (L068) and O-
rings (L060).

2.

Install HPRVs. Torque to the value in the table below.

3.

Operate the vehicle/machine through full range of con-
trols to ensure proper operation. Check for leaks.

Figure 5-51. Torque Sequence

Figure 5-52. Auxiliary Pads

Table 5-11. Cover Screw Torque

Cover Pad

Wrench size and Torque

A

17 mm 48 N•m [35 lbf•ft]

B

18 mm 77 N•m [58 lbf•ft]

Figure 5-53. High Pressure Relief Valves