Platform support torque values -9 – JLG 18RS Service Manual User Manual

Page 89

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121284

– JLG Lift –

4-9

and cables are pushed to the outside of the curve in
the power track. Adjust the loop of hoses between
the power track and carrier tube (See Figure 4-8.,
Hose Adjustment - Figure 5
) so that the minimum
distance between the carrier tube and hoses match
the dimension shown below.

11. Tighten hose clamp at location “D” (Figure 4-6.,

Hose Adjustment - Figure 4) until hoses are tight and
unable to be moved.

A
B
C
D

Torque to 54 ft.lbs. (73 Nm)
Loctite #242
Torque 565 ft. lbs. (766 Nm)
Check torque every 150 hours of operation

Figure 4-9. Platform Support Torque Values

NOTE:

If any rotator bolts are replaced,
all bolts on the rotator should
be retorqued.

Advertising