9 hose adjustment procedure, Hose adjustment procedure -6, Hose adjustment - figure 1 -6 – JLG 18RS Service Manual User Manual

Page 86: Hose adjustment - figure 2 -6, Hose pull order -6

Advertising
background image

SECTION 4 - BOOM & PLATFORM

4-6

– JLG Lift –

3121284

4.9 HOSE ADJUSTMENT PROCEDURE

1. Starting at the front of the machine, pull the hoses

and cables in the order shown in Table 4-1. Hose
Pull Order, th
rough the carrier tube (Figure 4-5.,
Hose Adjustment - Figure 3, locati
on B).

2. Pull the hoses and cables through the power track in

the same order as through the carrier tube. Position
the hoses and cables in the power track as noted in
the assembly drawings. Note the orientation of the

marking on the hoses and cables to insure there is
no twist. (See Figure 4-3., Hose Adjustment - Figure
1 below).

3. Pull the hoses and cables through the push tube in

the same order as the carrier tube and power track.

4. Adjust the pull lengths at position “A” (See Figure 4-

4., Hose Adjustment - Figure 2). With the pull
lengths set, tighten the hose clamp at position “A”
until hoses are tight and unable to be moved.

5. Adjust the pull lengths at position “B” (See Figure 4-

5., Hose Adjustment - Figure 3). With the pull

Table 4-1. Hose Pull Order

Pull

Order

Description

Qty

1

Control Cable, Upper Boom

1

2

Hose, 1/2" Airline (optional)

1

3

Cable, A/C 10/3 Upper Boom

1

Cable, 8/5 Upper Boom (optional)

1

4

Hose Assy, 10 [.375] JIC/JIC

2

5

Hose Assy, 6 [.25] JIC/JIC

2

Hose Assy, 6 [.25] JIC/JIC

1

Figure 4-3. Hose Adjustment - Figure 1

Figure 4-4. Hose Adjustment - Figure 2

Advertising