Assembly, Assembly -10, Routing installation of retract wire ropes -10 – JLG 600SC_660SJC Service Manual User Manual

Page 236

Advertising
background image

SECTION 7 - BOOM & PLATFORM

7-10

– JLG Lift –

3121157

10.

Inspect extend and retract wire rope attach point
components for cracks, stretching, distortion, or
other damage. Replace components as necessary.

11.

Inspect all threaded components for damage such
as stretching, thread deformation, or twisting.
Replace as necessary.

12.

Inspect structural units of boom assembly for bend-
ing, cracking, separation of welds, or other damage.
Replace boom sections as necessary.

Assembly

NOTE: When installing fly section wear pads, install same

number and thickness of shims as were removed
during disassembly.

1.

Measure inside dimensions of the base and mid
sections to determine the number of shims required
for proper lift.

2.

Measure inside dimensions of the mid section to
determine the number of shims required for proper
lift.

3.

Install side, top and bottom wear pads to the aft end
of fly section; shim evenly to the measurements of
the inside of mid section.

4.

Install retract wire ropes into aft end of fly section,
route wire ropes thru holes in side of fly boom sec-
tion and pull into slot.

5.

Install side, top and bottom wear pads to the aft end
of mid section; shim evenly to the measurements of
the inside of mid section.

WHEN ASSEMBLING BOOM SECTIONS, ENSURE THAT THE BOOM
SLIDING TRAJECTORIES HAVE BEEN CLEARED OF CHAINS,
TOOLS, AND OTHER OBSTRUCTIONS.

6.

Shim the insides of the boom sections for a total of
1/16 inch (0.062) clearance (if the action is centered,
there will be 1/32 clearance on each side).

7.

Slide fly boom section into the mid boom section.
Shim boom, if necessary, for a total of 1/16 inch
(0.062) clearance.

8.

Install wear pads into the forward position of the mid
boom section. Shim boom, if necessary, for a total of
2/10 inch (0.20 m) clearance.

9.

Properly position the retraction wire rope sheaves
assemblies at the aft end of the mid boom section;
ensure all sheave-to-mounting block attachment
holes align. Install the sheave pins and secure them
with mounting hardware. Position retract wire ropes
onto the sheaves.

Figure 7-14. Routing Installation of Retract Wire Ropes

Advertising