Chassis service notes - sheet 2 of 2 -3 – JLG 600SC_660SJC Service Manual User Manual
Page 47
SECTION 3 - GRADALL CHASSIS
3121157
– JLG Lift –
3-3
1
Track tension adjustment to be made between the idler and carrier roller - 0.781 inches (19.8
mm)
2
Never-Seez to be used on master link pin before assembly. Torque Pad bolts over master link to
65 ft-lbs +6,-6 then tighten 1/3 (120°)turn further.
3
Fill Plug
4
Check oil level of left & right crawler drives (0.69 gal. [2.6 L] grade 90 Gear Oil)
5
Drain Plug
6
Torque to 200 ft-lbs, +15 -0 (280 Nm, +21 -0)
7
Use Gradall 8381-3109 Large Button Head Grease Fitting Adapter to Adjust Tracks
8
Torque to 65 ft-lbs, +10 -0 (91 Nm, +15 -0)
9
Torque to 340 ft-lbs, +25 -0 (476 Nm, +35 -0)
10
Offset in Idler Spring from centerline of Idler to be oriented down.
11
Torque to 165 ft-lbs, +15 -0 (231 Nm, +21 -0)
12
Add Never-Seez to both mounting pilots Drive Motors
13
Torque to 230 ft-lbs, +15 -0 (322 Nm, +21 -0)
14
Torque to 93 ft-lbs, +10 -0 (130 Nm, +14 -0)
15
Torque to 53 ft-lbs, +5 -0 (74 Nm, +7 -0)
Figure 3-2. Chassis Service Notes - Sheet 2 of 2