Installation, Installation -10, Track roller required tools - installation -10 – JLG 600SC_660SJC Service Manual User Manual

Page 72

Advertising
background image

SECTION 4 - CAT CHASSIS (PRIOR TO S/N 0300128000)

4-10

– JLG Lift –

3121157

3.

Lift the side of the machine. Install Tooling (A) under
undercarriage (1), as shown. Adjust the height of
Tooling (A) in order to have sufficient clearance for
the removal of the track rollers.

4.

Loosen but do not remove the bolts that hold track
guide (2) to the undercarriage.

5.

Attach a suitable lifting device to Tooling (B). Posi-
tion Tooling (B) under track guide (2), as shown.
Remove the bolts that secure the track guide.
Remove track guide (2). The weight of track guide
(2) is approximately 18 kg (40 lb).

6.

Loosen but do not remove the bolts that secure
track roller (3) to the undercarriage.

7.

Attach a suitable lifting device to Tooling (B).

8.

Position Tooling (B) under track roller (3).

9.

Remove the bolts that secure track roller (3).
Remove track roller (3). The weight of track roller (3)
is approximately 25 kg (55 lb).

Installation

NOTE: There is a track guide on each side of the machine.

The procedure which follows is for the installation of
the track roller and the track guide.

1.

Make sure that all the mounting surfaces on the fol-
lowing components are clean and free of debris
before the following components are installed:

• Track Roller

• Track Guide

NOTE: Make sure that the fill/drain plug in the roller faces

toward the outside of the undercarriage.

Table 4-5. Track Roller Required Tools - Installation

Required Tools

Tool

Part Number

Part Description

Qty.

A

8S-7611

Tube Assembly

2

8S-7615

Pin

2

8S-7640

Stand

2

B

183-4797

Track Roller Lifting Fork

1

Advertising