3 rubber track pad installation, Rubber track pad installation -17 – JLG 600SC_660SJC Service Manual User Manual
Page 61
Advertising
SECTION 3 - GRADALL CHASSIS
3121157
– JLG Lift –
3-17
3.3 RUBBER TRACK PAD INSTALLATION
1.
Seat the rubber track pad over the center rib of the
steel track pad.
2.
Apply Loctite #242 to the steel retaining plate bolts.
Install the bolts and flat washers to the end of the
rubber pad.
3.
Torque the bolts to 70 ft-lbs. (97 Nm).
Advertising