3 rubber track pad installation, Rubber track pad installation -17 – JLG 600SC_660SJC Service Manual User Manual

Page 61

Advertising
background image

SECTION 3 - GRADALL CHASSIS

3121157

– JLG Lift –

3-17

3.3 RUBBER TRACK PAD INSTALLATION

1.

Seat the rubber track pad over the center rib of the
steel track pad.

2.

Apply Loctite #242 to the steel retaining plate bolts.
Install the bolts and flat washers to the end of the
rubber pad.

3.

Torque the bolts to 70 ft-lbs. (97 Nm).

Advertising