Extension end rails, Extension end rails -30, Extension end rail removal -30 – JLG 67SL Service Manual User Manual

Page 62

Advertising
background image

SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3-30

– JLG Lift –

3121322

Extension End Rails

NOTE: Before rails can be lowered, loosen the bolt on the

plastic rail-guide rollers and lower the roller so that it
is not hindering the lowering of the rails.

Removal:

1.

Disconnect End Rail (1) from Side Rail (2) by remov-
ing the two Spring Cotters (3).

2.

The Chain Assembly can be removed from the End
Rail by removing the Bolts (4), Nuts (5), and Flat-
washers (6).

3.

Remove the Spring Cotter (7) on each leg of the End
Rail. Carefully fold the end rail inward to its stowed
position.

4.

The End Rail can be removed by removing the Cap-
screws (8), Locknuts (9), and Washers (10) on each
leg of the End Rail.

Installation:

1.

Lay end rail on the platform deck in the rails stowed
position, lining up the bolt holes with the appropriate
connection points on the platform.

2.

Follow the removal instructions in reverse order.

1

2

3

4

5

6

7

8

9

10

1.

Extension End Rail

2.

Extension Side Rail

3.

Spring Cotter

4.

Bolt, M8 x 20mm

5.

Nut, M8

6.

Flatwasher, M8

7.

Spring Cotter

8.

Capscrew, M10 x 80mm

9.

Locknut, M10

10.

Washer, 10mm

Figure 3-28. Extension End Rail Removal

Advertising