SECTION 3 - CHASSIS, PLATFORM & SCISSOR ARMS

3-32

– JLG Lift –

3121322

Main Platform End Rails

Removal:

1.

Disconnect End Rails (1) from side rails by removing
the Hairpin Springs (2). Remove the Pins (3).

2.

Remove second set of Hairpin Springs (4) and Pins
(5).

3.

Rotate Link (10) to opposite side.

4.

Remove Hairpin Springs (6) on the legs of the end
rails.

5.

Carefully fold end rails inward so they are in the
stowed position.

6.

Remove the end rails from the platform by removing
the four Bolts (14), Nuts (15), and Flatwashers (16).

NOTE: The gate can be detached from the left end rail by

removing the screws on each of the hinges.

Installation:

1.

Lay end rails on the platform deck in the rails stowed
position, lining up the bolt holes with the appropriate
connection points on the platform.

2.

Follow the removal instructions in reverse order.

NOTE: The gate can be attached to the left end rail by

replacing the screws on each of the hinges.

2

3

4

5

1

6

7

8

9

10

11

12

13

13

14,15,16

1.

End Rails (Right, Left, and
Gate)

2.

Hairpin Spring, M3

3.

Pin

4.

Hairpin Spring, M3

5.

Pin

6.

Hairpin Spring, M4

7.

Bolt, M8 x 20mm

8.

Nut, M8

9.

Flatwasher, M8

10.

Link

11.

Bolt, M10 x 40mm

12.

Nut, M10

13.

Flatwasher, M10

14.

Bolt, M10 x 80mm

15.

Nut, M10

16.

Flatwasher, M10

Figure 3-30. End Rail Removal