2 before you start, Product completeness check, Installation requirements – 2N Analogue UMTS gateway 2N SmartGate UMTS - Manual, 1699 v1.1.0 User Manual

Page 17: Before you start 2.2

Advertising
background image

Before You Start

2.2

17

2.2 Before You Start

Product Completeness Check

Check the product for completeness before installation please:

n

1× 2N

®

SmartGate UMTS

n

1× Magnetic Antenna with coax cable

n

1× Supply adapter

n

2× Telephone Cable

n

1× PC-connection USB cable

n

1× SMS sending input connector

n

2× Dowel

n

2× Screw

n

1× CD-ROM with User Manual and software

1)

n

1× Quick Installation Guide

Note

n

1)

Enclosed software:

2N® SmartGate PCManager

2N® SmartGate SMS gateway for easy SMS sending and receiving

2N® SmartGate UMTS Driver for PC

User Manual in PDF format

Installation requirements

n

2N® SmartGate UMTS is designed for vertical mounting on suspension holes

(use the mounting pattern). This position is the best for signal reception because

a vertical antenna is used. 2N® SmartGate UMTS can be operated in the

horizontal position too where the UMTS/GSM signal is good.

n

Install 2N® SmartGate UMTS with respect to the UMTS/GSM signal strength –

check the signal strength using the PCManager.

n

Place 2N® SmartGate UMTS out of range of sensitive devices and human bodies

for electromagnetic interference reasons.

n

For the allowed range of operating temperatures refer to the “Technical

Parameters”.

n

2N® SmartGate UMTS can disturb other telecommunication systems. Place

phone lines and connected terminals and PBX’s faraway from antenna.

n

It is impossible to operate 2N® SmartGate UMTS on sites exposed to direct

solar radiation or near heat sources.

Advertising