Brief installation guide, Installation conditions, 2 brief installation guide – 2N BRI Lite/Enterprise v1.1 User Manual

Page 23: Brief installation guide 2.2

Advertising
background image

Brief Installation Guide

2.2

23

2.2 Brief Installation Guide

Installation Conditions

The following installation conditions have to be met for a proper installation:

2N

®

BRI Enterprise / BRI Lite is to be installed on a site with enough free

space.

2N

®

BRI Enterprise / BRI Lite is to be mounted on a suitable vertical surface.

For this purpose, a hanger is included in the gateway delivery, which is fitted
to the wall using dowels and screws and used for gateway hanging.

It is possible to operate the gateway in another working position too, e.g. on
a desk, for a short time for servicing and testing purposes, for example.

Any excess of the allowed working temperature may not affect the 2N

®

BRI

Enterprise / BRI Lite function immediately but may result in faster ageing and
lower reliability. For the allowed working temperature and humidity ranges
refer to S. 8, p. 101.

2N

®

BRI Enterprise / BRI Lite is not designed for high-vibration environments

such as means of transport, machine rooms, and similar.

2N

®

BRI Enterprise / BRI Lite is not designed for dusty environments or

places exposed to high humidity and temperature changes.

2N

®

BRI Enterprise / BRI Lite may not be exposed to aggressive gases, acid and

solvent vapours (during cover cleaning, e.g.).

2N

®

BRI Enterprise / BRI Lite is intended for indoor use. It may not be exposed

to rain, flowing water, condensing moisture, fog, and so on.

Advertising