4 operation, 1 status indication – INFICON Stripe CDG045Dhs 0.01 ... 1000Torr / mbar, new 10mTorr User Manual

Page 23

Advertising
background image

tina84e1 (2014-07)

23

4 Operation

Put the gauge into operation. If you are using an INFICON con-
troller, define the measurement range (

[1], [2].

A warm-up time of at least ½ hour should be allowed; for precise
pressure measurements a warm-up time of at least 2 hours is
required.

4.1 Status

Indication

LED LED

status

Meaning

<STATUS> off

no

supply

voltage

lit solid green

measurement mode

blinking

green

short blinks
long blinks


warning, over/underrange
warming up

lit solid red

error

<SP1> lit

green

green

p

setpoint 1

blinking green

waiting for setpoint 1 input

off

p > setpoint 1

<SP2>

lit solid green

p

setpoint 2

blinking green

waiting for setpoint 2 input

off

p > setpoint 2

EtherCAT LEDs

→  [3]

Advertising