4 power switch and circuit breaker, 5 switching on the instrument, Power switch and circuit breaker – Leica Biosystems CM1520 User Manual

Page 26: Switching on the instrument, Instrument setup

Advertising
background image

26

Instructions for Use V1.3 – 10/2012

5.4 Power switch and circuit breaker

The switch must be in the top position (switch position 1) for switching

on the circuit breaker.

The switch must be in the bottom position (switch position 0) for switching

off the circuit breaker.

5.5 Switching on the instrument

5.

Instrument Setup

Fig. 13

Automatic cutout

• Switch the instrument on at the circuit breaker. The instrument is now initialized.
• The instrument is factory-configured as follows:

Time:

00:00

Defrost time:

23:45

Chamber cooling:

On

(Indication of the temperature)

• Program the desired values as described under 6.2.1 to 6.2.3.

The software version "0.40" (shown here only as an example) is displayed

in the 4-digit display for the time. This display disappears after 2 seconds

and switches to the display of the instrument type "1520". The standard

time is then displayed.

After transporting, wait at least 4 hours before turning the instrument on. This waiting

period is necessary to allow the compressor oil, which may have been displaced during

transport, to return to its original position. Failure to comply with this may cause damage

to the instrument.

In normal operation, a pressure compensation shortly before the compressor starts up

might lead to a hissing sound.

Advertising