Before switching on

Before the initial commissioning, before commissioning after an extended standstill time

or before commissioning after an overhaul of the motor, absolutely check the following:
ƒ Are all screwed connections of the mechanical and electrical parts firmly tightened?
ƒ Is the unrestricted cooling-air inlet and outlet ensured?
ƒ Are the protective devices against overheating (thermal sensor evaluation) effective?
ƒ Is the drive controller correctly parameterised for the motor?

(E Drive controller operating instructions)

ƒ Are the electrical connections o.k.?
ƒ Does the motor connection have the correct phase sequence?
ƒ Are rotating parts and surfaces, which can become very hot, protected against

touching?

ƒ Is the permanent lubrication connected?



Danger!

Built-in brakes are not fail-safe brakes!

6.2

Functional test

ƒ After commissioning, check all single functions of the drive:

– Direction of rotation of the motor

If the motor does not turn in the correct direction, exchange two phases.

– Torque behaviour and current capacity
– Braking effect of the mounted brake
– Function of the feedback system

ƒ In case of malfunctions or faults: E Ch. 8.