The 9352 brake chopper, Electrical installation – Lenze EMB9352−C User Manual

Page 102

Advertising
background image

Electrical installation

The 9352 brake chopper
Connection to the 8200 vector controller (15 − 90 kW)

7

l

102

EDBMB935X DE/EN/FR 13.0

7.5

The 9352 brake chopper

7.5.1

Connection to the 8200 vector controller (15 − 90 kW)

U V W

Z2

9352

Z1

PE

+UG

+UG

RB1

-UG

-UG

RB2

K1

RFR

L1 L2

L3

28

A1

"

"

OFF

K1

K1

Z4

ON

F4 F5

PE

PE

"

"

L3

N

PE

L1

L2

" "

"

"

JRB

M

3~

PE

"

"

K1

F1...F3

Z3

9350br_007

Fig. 13

Connection of the 9352 brake chopper to controllers 8200 vector (15 − 90 kW)

Z1

Brake chopper

Z2

Controller

Z3

Mains choke

Z4

Brake resistor

K1

Mains contactor

F1 ... F3

Mains fuses

F4, F5

DC−bus fuses (recommendation)

Advertising
This manual is related to the following products: