MK Diamond MK-101 Pro24 User Manual

Page 21

Advertising
background image

21

VOLTAGE:

120v

CYCLE:

60hz

PHASE:

1-phase

(A)

Ensure the ON/OFF Switch

is in the OFF position.

(B)

Plug MK-101 into the GFCI.

(C)

Plug the GFCI into the

power source.

CAUTION

MK-101 Pro24

OPERATION

SETUP FOR OPERATION

1. Before powering or starting, check for damage that could prevent this equipment

from proper operation or performing it’s intended function. Check for binding and

proper alignment of moving parts. Check for damaged, broken, or missing parts.

2. Verify the On/Off switch is in the OFF position.

3. Before connecting the MK-101 to a power supply, be sure the voltage, cycle and

phase of the job site power source meet these requirements;

4. I f using an extension power cord, make sure, the length and wire gauge corre-

spond to the requirements listed in on page 10. An extension power cord that is

too small in wire gauge

(diameter), or too long in length, will cause the motor to overheat and could cause

premature failure.

5. Use an approved Ground Fault Circuit Interrupter (GFCI)

6. Do not cover the motor vents as this could lead to motor overheating.

NOTE: In order to avoid breaker tripping, a 20-amp circuit breaker should be used.

If using a portable generator, ensure the generator meets the following minimum requirements:

5 KW

120/240 volts

41.7/20.8 amps

Single Phase

PORTABLE GENERATOR

This saw is to be used with a Ground Fault Circuit Interrupter.

GROUND FAULT CIRCUIT INTERRUPTER (GFCI)

Advertising
This manual is related to the following products: