MK Diamond MK-101 Pro24 User Manual

Page 33

Advertising
background image

33

NOTE: 1. When a new belt is installed, it should be inspected and re-tensioned after the first

forty-eight (48) hours of operation.

(A)

Remove the Diamond Blade.

(B)

Remove the Cutting Head (See

Adjusting the Cutting Head).

(C)

To remove the Belt Guard,

loosen the two top bolts on the

belt guard.

(E)

Inspect the belt for cracks,

fraying, separation and wear.

Go to step I if replacement

required.

(D)

Remove belt guard

bottom bolt.

(F)

Check the belt for proper

tension, if tension is correct, go

to step P (proper tension is

1/8-inch).

(G)

Loosen the motor mounting

bolts, if re-tensioning only go

to step M.

(H)

Loosen the Motor Adjustment

Strap.

(I)

Push the motor toward the

front of the Cutting Head to

loosen the belt.

MK-101 Pro24

MAINTENANCE

BELT INSPECTION, ADJUSTMENT AND REPLACEMENT

The MK-101 is designed with a power transmission belt. In order to ensure the MK-101 operates at peak

efficiency, the V-belt should be inspected monthly, and changed if the belt shows damage and/or exces-

sive wear.

Advertising
This manual is related to the following products: