Link layer diagnostics and delay monitoring, Table 8-3, Dual trunk e1 router – Black Box LRU4240 User Manual

Page 83

Advertising
background image

Dual Trunk E1 Router

Dual Trunk E1 Router User’s Guide

TECHNICAL: 0118 96 56 000

71

When performing a test, you can:

• Initiate loopbacks and tests on full bandwidth or on NET 1 or NET 2.

• Set programmable test patterns

Link Layer Diagnostics and Delay Monitoring

When installing or maintaining wide area connections, you must verify the end-to-end operation of
the WAN links. With dedicated E1 line, you can verify the WAN link by placing the Dual Trunk E1
Router on one end of the line in a loopback test and initiating the transmission of a pattern test from
the other end. The pattern is received and monitored to detect transmission errors.

Table 8-3

Tests Allowed Through Telnet Connection

Test

COM

NET

Self Test

Yes

Yes

Loop Net

Yes

No

Loop Payload

Yes

No

Loop Up Remote

Yes

No

Loop Down Remote

Yes

No

QRW Pattern

Yes

No

1:7 Pattern

Yes

No

3:24 Pattern

Yes

No

1:1 Pattern

Yes

No

All 1s Pattern

Yes

No

All 0s Pattern

Yes

No

1:2 Pattern

Yes

No

1:4 Pattern

Yes

No

User 1 Pattern

Yes

No

User 2 Pattern

Yes

No

Lamp Test

Yes

Yes

NOTE: You do not need to notify the telephone company that you are running
the tests. However, if the tests reveal a problem with telephone company
service or with the Dual Trunk E1 Router, you should inform the telephone
company that the Dual Trunk E1 Router must be removed from service.

Advertising