Setup
Check the following components of the SyncPro II once it has been installed.
R
F
1 & R
F
2 Resistor Setup
The synchronous motor field discharge resistor feedback resistors (RF1, RF2) are
necessary to attenuate the induced voltage waveform which appears across the
field discharge resistor during starting (
). The resistors (RF1, RF2)
reduce the voltage which is seen at the terminals of the analog/digital pulse
converter to a level which is acceptable to the optoisolators on the board.
Guidelines for resistor settings are contained in
The resistance value shown is the amount of resistance which is required on each
lead which is connected to the A/D pulse board (F1, F2). For example, if the
induced voltage on the discharge resistor is 1000V at zero speed and 600V at 95%
speed (across the entire discharge resistor), then it is necessary to select taps on
the RF1 and RF2 to provide 20 k
Ω
at RF1 and 20 k
Ω
at RF2.
Figure 10 - Discharge Resistor Installation
These settings must be made prior to any start attempt.