Rockwell Automation 6157-C User Manual User Manual

Page 18

Advertising
background image

18

Industrial 19" CRT Monitor

Publication 6157-UM001A-EN-P

Note:

Clearance between the inside edges of the front
mounting rails is nominally 17.75 in. (451 mm) for
standard cabinets.
This clearance can vary somewhat and might or might
not be adjustable. Ensure that the clearance is at least
17.65 in. (448 mm) for standard monitors and at least
17.73 in. (450 mm) for monitors with magnetic shields
option installed.

Note:

Magnetic shields are secured with nylon rivets inserted
through their sides. The rivet heads require clearance
greater than 17.73 in. (450 mm). If this additional
clearance is not available, the rivets must be removed
before the monitor is installed in the cabinet.

Step 2 - Install the slides in the cabinet:

1.

Disassemble each slide by pressing out the spring-loaded stop that
holds the intermediate section of the slide to the stationary section.
Pull the intermediate section all the way out of the stationary section.

2.

Mount the stationary section of one slide to the front and rear
mounting rails using the hardware supplied with the slides. Ensure
that the slide is aligned on the center line you located previously.

Figure 8
Chassis Slide Aligned on Center Line

3.

Tighten the mounting screws enough to hold the slides in place.

Advertising