Rockwell Automation MPAI Heavy Duty Electric Cylinders User Manual

Page 48

Advertising
background image

48 MP-Series Heavy Duty Electric Cylinders

Rockwell Automation Publication MPAI-IN001E-EN-P - March 2012

Frame Size 83, 10 mm Roller Screw Load Correction

K

MPAI-x3xxxSM3xx

= 0.44 (F

Xpeak

/F

Xn

)-0.15

Frame Size 110, 5 mm Roller Screw Load Correction

K

MPAI-x4xxxSM3xx

= 0.26 (F

Xpeak

/F

Xn

)-0.15

Frame Size 110, 10 mm Roller Screw Load Correction

K

MPAI-x4xxxSM3xx

= 0.40 (F

Xpeak

/F

Xn

)-0.15

3. Calculate the lubrication interval (

t

l

) in hours.

t

1

= t

bl

x K, h

Use the basic lubrication interval (t

bl

) and the load correction factor (K) from

step 1

and

step 2

.

4. When the calculated lubrication interval elapses, refill the lubricant reservoir through

the grease fitting.

IMPORTANT

The maximum lubricant fill capacity for a roller screw drive is the following:

3.0 g of factory recommended lubricant for frame size 83

5.0 g of factory recommended lubricant for frame size 110

Advertising