Metrohm 766 IC Sample Processor User Manual

Page 21

Advertising
background image

2 Installation

766 IC Sample Processor

16

2.3.8

Tubing connections 766 – 733

For transferring the sample from the 766 IC Sample Processor to the

injection valve of the 733 IC Separation Center the following tubing

connections must be made:

Pump tubings are consumable material with a lifetime which depends

on the contact pressure (see section 6.3.3). This is why the tubing

cartridges should be raised completely by loosening snap-action lever

17

17 on the right-hand side if the pump is to remain switched off for a

considerable length of time (the set contact pressure remains un-

changed).

The 6.1826.0X0 pump tubing is made of PVC and must not be used

for rinsing with solutions which contain acetone. In such cases, rinse

with different pump tubing or a different pump.

1 Install pump tubing

•

Release tubing cartridge 13

13 from holding clamp 16

16 by

pressing down snap-action lever 17

17 and remove from

mounting pin 12

12 on the 766 IC Sample Processor (see Fig.

1).

•

Press contact pressure lever 15

15 on the tubing cartridge down

as far as it will go.

•

Insert pump tubing 10

10 in the tubing cartridge 13

13 as shown in

Fig. 9. The black-black stopper 36

36 must click into the corre-

sponding holder on the left-hand side of the tubing cartridge.

•

Place the tubing cartridge 13

13 on mounting pin 12

12 and press

down on the right-hand side until snap-action lever 17

17 clicks

into position on holding clamp 16

16. Take care that no kinks are

formed in the pump tubing.

2 Connection needle – pump tubing

•

Mount the PEEK compression fitting 66 on one end of the

PEEK capillary 88 and the PEEK compression fitting 34

34 on the

other end.

•

Screw the PEEK capillary 88 with the PEEK compression fitting

66 on to the PEEK compression fitting 55 already mounted on

needle holder 44 (see Fig. 6).

•

Insert PEEK capillary 88 into the guide chain 99 (see Fig. 1 and

section 2.3.8).

•

Screw a coupling 35

35 on to the PEEK compression fitting 34

34 at

the other end of PEEK capillary 88.

•

Push coupling 35

35 on to the inlet end of the pump tubing 10

10

(see Fig. 6).

Advertising