Installation and mechanical alignment – Banner A-GAGE High-Resolution MINI-ARRAY Series User Manual

Page 12

Advertising
background image

P/N 64118 rev. B

Installation and Mechanical Alignment

12

Banner Engineering Corp.

Minneapolis, U.S.A.

www.bannerengineering.com • Tel: 763.544.3164

3. Installation and Mechanical Alignment

3.1 Emitter and Receiver Mounting

Banner MINI-ARRAY emitters and receivers are small, lightweight, and easy to handle

during mounting. The mounting brackets (supplied) allow ±30° rotation.

From a common point of reference, make measurements to locate the emitter and

receiver in the same plane with their midpoints directly opposite each other. Mount the

emitter and receiver brackets using the vibration isolators and M4 Keps nuts (all

supplied). See Figure 3-1. Standard M4 or #8-32 bolts may be substituted (and the

vibration isolators eliminated) in situations where the emitter and receiver are not

subjected to shock or vibration forces. While the internal circuits of the emitter and

receiver are able to withstand heavy impulse forces, the vibration isolators dampen

impulse forces and prevent possible damage due to resonant vibration of the emitter or

receiver assembly.

Figure 3-1. A-GAGE High-Resolution MINI-ARRAY emitter and receiver mounting hardware

Mounting

Surface

M4 Keps

Nut (8)

M4 x 10 mm

Slotted Hex Head

with Com pres sion

Washer (2)

Mounting

Bracket

Emitter or

receiver

Anti-Vibration

Mount (4)

Mounting

Bracket

Washer

Nut

Studs: M4 x 0.7

9.5 mm (0.38") long

Advertising