Section 3: installation procedures, 01 introduction, 02 site location – Tweco 6000 CE Merlin User Manual

Page 19: 03 unpacking, 04 removing skid

Advertising
background image

Manual 0-2601

3-1

INSTALLATION PROCEDURES

SECTION 3:

INSTALLATION

3.01 Introduction

This Section describes installation of the Master Power
Supply. These instructions apply to the Master Power
Supply Assemblies only; installation procedures for Slave
Power Supply, Options and Accessories are given in
Manuals specifically provided for those units.

The complete installation consists of:

1. Site selection

2. Unpacking

3. Connections to Power Supply

a. Input power

b. Internal power selection

c. Work cable

d. Gas connections

e. Torch Installation

f. Connecting auxiliary devices

4. Grounding

5. Operator training

3.02 Site Location

Select a clean, dry location with good ventilation and ad-
equate working space around all components.

CAUTION

Operation without proper air flow will inhibit
proper cooling and reduce duty cycle.

The Master Power Supply is cooled by air flow through
the front, rear, and side panels. Air flow must not be ob-
structed. At least 2 feet (0.61 m) of clearance should be
provided on all sides.

NOTE

When using the Slave Power Supply in parallel
with the Master Power Supply the supplies should
be placed next to each other. Placing one Power
Supply behind the other will cause heated air to be
drawn into the rear Power Supply. This condition
may lower the duty cycle of the system.

Review the safety precautions in the front of this manual
to be sure that the location meets all safety requirements.

3.03 Unpacking

Each component of the system is packaged separately and pro-
tected with a carton and packing material to prevent damage
during shipping. Components are packaged as follows:

A. Power Supply

The power supply is skid-mounted and protected with a carton
and padding material to prevent damage during shipment. The
power supply with work cable are factory-assembled and pack-
aged together. Also packed with the system are:

• Torch and torch leads

• Torch Supply Leads

• Spare parts kit for the torch

• Coolant deionizing bag

• Arc Starter Box

• Operating Manual for Power Supply

B. Torches

Torches and leads are packaged with the Power Supply. Spare
parts for new torches are packed in a spare parts box. Separate
instruction manual is provided with each torch.

C. Options and Accessories

Options and Accessories are packaged separately from the
Power Supply.

D. Unpacking Procedure

1. Unpack each item and remove all packing material.

2. Locate the packing list(s) and use the list to identify

and account for each item.

3. Inspect each item for possible shipping damage. If

damage is evident, contact your distributor before pro-
ceeding with installation.

3.04 Removing Skid

The Power Supply is mounted on the skid with two brackets.
Remove the Power Supply from the skid as follows:

1. Remove the six bolts connecting the brackets to the base of

the Power Supply.

Advertising