Figure 12: Hydraulic Draw-Up of Sections

B

. HYDROSTATIC TEST — After the boiler sections

have been assembled, it is essential that the boiler be

hydrostatically tested before the canopy, flue cover

plates, jacket, or piping is installed.
1. Tankless Heater Installation
If boiler is ordered with tankless heaters, install

heaters with the gaskets provided. Table IV

on Page 37 gives the maximum number of heaters

permissible per assembly and the heater ratings.

2. Plug all boiler tappings and fill boiler completely

with cold water.

Figure 13: Boiler Section Assembly

4. EXAMINE BOILER CAREFULLY, INSIDE AND

OUTSIDE, to insure against leaks from cocked

nipples or through concealed breakage caused in

shipping and handling. This precaution is for your

protection and will simplify handling of necessary

replacements and adjustment claims.

5. After making certain that there are no leaks, drain

boiler and remove plugs for boiler trim and other

connections.

3. All completed boilers must satisfactorily pass the

prescribed hydrostatic test.
a. STEAM BOILERS: The assembled boiler must

be subjected to a hydrostatic test of 45 psig to 55

psig.

b. HOT WATER BOILERS: The assembled boiler

must be subjected to a hydrostatic test of not less

than 1½ times the maximum allowable working

pressure (MAWP).

CAUTION

DO NOT install gauge until after hydrostatic

testing the boiler. Gauge failure may result.

WARNING

Failure to properly hydrotest all boilers at

the correct pressure may result in section

assembly failure in operation.