Caution, Notice, Warning – Crown Boiler 24-07 User Manual

Page 51

Advertising
background image

51

sufficiently to permit a steady trickle of water

from the surface blowoff pipe. Continue this

slow boiling and trickle of overflow for several

hours until the water coming from the overflow

is clear.

d. Stop burner and drain boiler in a manner and to

a location that hot water can be discharged with

safety.

e. Refill boiler to normal water line. If water in

gauge glass does not appear to be clear, repeat

steps (a. thru e.), and boil out the boiler for a

longer time.

2. Low pressure steam boilers such as the Series

24 should be maintained with appropriate water

treatment compounds. After cleaning process has

been completed, add water treatment compounds

as recommended by your local qualified water

treatment company.

3. Remove temporary surface blowoff piping and

replug tapping. Boil or bring water temperature to

180°F promptly in order to drive off the dissolved

gases in the fresh water.

4. If unsteady water line, foaming or priming persist,

install gate valve in Hartford Loop and drain valves

in return main and at boiler and proceed as follows:
a. Connect hoses from drain cocks to floor drain.

Close gate valve in Hartford Loop and open

drain cock in return main. Fill boiler to normal

water level, turn on burner and operate boiler

at this water level for at least 30 minutes after

the condensate begins to run hot, then turn off

burner.

Close all radiator valves. Remove all supply

main air valves and plug the openings in supply

main.

b. Draw about 5 gallons of hot water from boiler

into a container and dissolve into it appropriate

amount of a recommended boilout compound.

Remove surface blowoff plug and pour this

solution into boiler, then reinstall plug.

c. Turn on burner and keep operating while feeding

water to boiler slowly. This will raise water level

in boiler slowly so that water will be boiling hot

and will rise slowly into supply main and back

through return main, flowing from drain hose

at about 180°F. Continue until water runs clear

from drain hose for at least 30 minutes.

d. Stop feeding water to boiler but continue

operating burner until excess water in boiler

flows out through supply main and water lowers

(by steaming) until it reaches normal level in

boiler. Turn off burner. Drain boiler. Open all

radiator valves. Reinstall all supply main air

valves. Open gate valve in Hartford Loop.

e. When boiler has cooled down sufficiently (crown

sheet of sections are not too hot to touch), close

CAUTION

Probe and float type low water cutoff

devices require annual inspection and

maintenance.

4. CHECK OPERATING CONTROL on boiler

equipped with tankless heaters. With burner off,

draw hot water until burner starts, then turn off hot

water and check burner shutdown.

5. CHECK RTC CONTROL - see the Test Section in

the RTC Installation and Maintenance Manual.

K.

BOILER AND SYSTEM CLEANING - STEAM

BOILER

NOTICE

A qualified water treatment chemical

specialist should be consulted for

recommendations regarding appropriate

chemical compounds and concentrations

which are compatible with local

environmental regulations.

WARNING

Chemicals used in treating boiler water are

toxic and/or harmful. Always use protective

clothing and equipment when working

with/near chemicals. Contact local

authorities to determine if treated boiler

water can be discharged into local waste

water system.

1. Oil, greases & sediments which accumulate in a

new boiler and piping must be removed in order

to prevent an unsteady water line and carry over

of the water into the supply main above boiler.

Operate the boiler with steam in the entire system

for a few days allowing the condensate to return

to the boiler. If the condensate can temporarily be

wasted, operate boiler only for the length of time

it takes for condensate to run clear. If the latter

cannot be achieved or if the condensate is returned

to the boiler, boil out the boiler using the SURFACE

BLOWOFF connection. See Figure 40a.
a. Drain boiler until water is just visible in gauge

glass. Run temporarily 1½” pipe line from the

surface blowoff connection to an open drain or

some other location where hot water may be

discharged safely. Do not install valve in this

line.

b. Add an appropriate amount of recommended

boilout compounds.

c. Start burner and operate sufficiently to boil

the water without producing steam pressure.

Boil for about 5 hours. Open boiler feed pipe

Advertising
This manual is related to the following products: