Crown Boiler 24-07 User Manual

Page 44

Advertising
background image

44

Figure 40b: Water Boiler - Pressure Relief Valve

Hook-Up

placement. The 14 gauge mounting bracket must

be attached to the jacket first using four (4) #8 x ¾”

drill point sheet metal screws.

One may find it easier to install some of the conduit

connectors with their corresponding conduit runs onto

the RTC back panel before mounting to the bracket.

The actual controller can and should be removed from

the back panel during the mounting process. This

will eliminate the potential for accidental damage to

the controller. The RTC back panel is mounted onto

the bracket with (4) #8-32 x ½” type F, Phillips Pan

head screws supplied with the controller. The middle

3 rear knockouts should be used before utilizing the 5

knockouts exiting the bottom of the control. Depending

on the final configuration, most of the controller

connections could be used. Typically, the return sensor,

actuator control and boiler pump exit the rear of the

controller.

Wire the RTC controller to the various components

as shown below. The “Mix” and “Outdoor” sensor

are optional and must be connected if outdoor reset

function is desired. The outdoor reset function on

this controller cannot be used in a multiple boiler

application. A boiler sequencer must be used when an

outdoor reset feature is required in a multiple boiler

application.

Advertising
This manual is related to the following products: