Figure 34: Minimum Piping Requirements For Gravity Return Series 24 Steam Boilers

NOTES: 1.

All piping is schedule 40.

2.

To prevent condensate from being trapped in header

, do not reduce

equalizer elbow at header connection. 3.

Ball valve preferable, gate valve acceptable alternative

(supplied by others).

• Minimum valve size per

ASME code is 3/4” NPT

24-03/24-04;

1” NPT

24-05/24-08; 1-1/4” NPT

24-09/24-12.

• Increasing the valve size will improve the blowdown operation.

• In all cases, piping connecting blowof

f valve to boiler shall be full

size to the point of discharge.

4.

Header piping may be run over top of the boiler if space does not

allow for piping arrangement shown. Increased service

requirements will

result however

.

5.

Supply from the boiler header must be connected between the fi

rst

boiler riser and the header drip (or Hartford Loop). Do not connect

supply between risers or opposite end of boiler header

.