Leveling drill – Great Plains 1525P Operator Manual User Manual

Page 19

Advertising
background image

8/14/2006

118-949M

17

Preparation and Setup

Leveling Drill

Single Gauge Wheel
Refer to Figure 2

Initially adjust drill so bottom of opener tube runs
26 inches above ground when drill is lowered in
the field.

Refer to Figure 3

To adjust:

1.

Make sure block mount of the spring linkage
(2) is in the lower mount hole for planting in
bedded irrigation. The upper hole is for non-
bedded ground.

2.

Set turnbuckle length. Turn turnbuckle to
shorten or lengthen as necessary. Initially set
length to 17 1/2 inches between pin centers to
achieve the 26-inch dimension mentioned
above. When adjusting the turnbuckle length,
remember:

Lengthening turnbuckle raises drill.

Shortening turnbuckle lowers drill.

3.

Level drill with top three-point link.

Refer to Figure 4

NOTE: When drill is level, parallel links will be
running slightly uphill towards the front.

The 1-inch dimension shown in figure 4 is a gen-
eral dimension that will vary with planting condi-
tions.

IMPORTANT! Make sure the opener mount is
running higher than the opener body. This will
ensure an ample reserve for opener upfloat in
case the opener strikes a rock or other object.

Figure 2

Initial Operating Height

22530

Figure 3

Gauge-Wheel Turnbuckle

22845

Figure 4

Leveling the Drill

22823

Advertising
This manual is related to the following products: