Operator’s manual, Additional operating conditions – Great Plains DICKEY-john Auto Section Control User Manual

Page 44

Advertising
background image

OPERATOR’S MANUAL

Auto Section Control System

11001-1561B-201207

42 / SYSTEM OPERATION

the left and right indicator identifies the action (on or off) to occur when

section indicators are moved.

5. Right Section Indicator buttons define all sections in the right group

to be controlled by the right Auto/On/Off button when moved. The color

of the left and right indicator identifies the action (on or off) to occur

when section indicators are moved.

6. All On or All Off buttons turns all sections on or off when pressed and

moves left and right section indicators back to the outside.

ADDITIONAL OPERATING CONDITIONS

ADJUSTING IMPLEMENT POSITION

The Flip button performs a flip function that adjusts the implement to its

actual heading (North, South, East, West direction) if the initial tractor

movement is reverse, such as backing to a corner. The Flip button should

only be used after a true moving heading has been established to reposition

the implement.
The Cycle button located on the bottom of the Auto Section Control

terminal also performs the Flip functionality. Refer to (

Figure 4

) for Cycle

button location.

MARKING/PLANTING HEADLANDS

For use if headlands will be planted last or after all long internal areas of the

field have been planted.

IMPORTANT: Auto Section Control MUST be in Manual mode when

planting marked headlands.

The Override button allows headland swaths to be marked first and planted

last and allows for inland rows to automatically turn on and off when the

marked headland is reached.
To Mark a Headland Swath:

1. Drive to the beginning of the headland.

2. Press the Override button and put implement lift switch in down

position (hydraulic drive systems leave master switch off).

3. Start driving the headland swath to mark.

4. At the end of the headland swath, press the Override button or lift the

planter (implement lift switch in up position) to disengage override.

5. Continue to mark additional headland swaths until complete. Swaths

can be marked as follows:

– If the inner most headland is known, this is the only swath that is

required to be marked.

– If the inner most headland is not known, all swaths can be marked.

6. Ensure system is placed back in Auto mode once headland swaths

have been completed.

Planting a Marked Headland:

Advertising