Installing the Dell PowerVault 56F 16-Port Fibre Channel Switch

1-1

       

    

    

This chapter discusses the following aspects of installing the Dell PowerVault 56F
16-Port Fibre Channel switch:



Unpacking the switch



Power requirements



Site location



Installing a GBIC module with power on



Fibre channel cable connections



Front panel controls



Ethernet connections



Verifying power-on self-test (POST)

(   )* +,-) 

NOTE: Some items may be shipped as part of an over-pack.

While unpacking the switch, check to make sure the following items are included:



PowerVault 56F switch unit



Power cord



Five copper gigabit interface converter (GBIC) modules or four optical and one
copper GBIC modules, depending on the switch configuration



User’s Guide, this Installation and Troubleshooting Guide, and the Switch Man-
ager Guide
(if ordered)



Installation kit, which includes rubber mounting feet

Save packing materials in case you need to return the switch.