Top link bracket device – Cub Cadet 8404 User Manual

Page 254

Advertising
background image

CHAPTER 9 8354/8404

9-20

D615-W02 May-2003

615W924A

11.2 OPERATION

If shock is applied to the implement, it will be absorbed
by cover (3), spring (4), and top link and connected to
linkage by plate (7) and tie rod (9) to elevate the imple-
ment.

This time, the oil flow passage will be changed by link-
age in the MLS valve.

11.1 STRUCTURE

(1) Top Link Holder

(2) Flange

(3) Cover

(4) Spring

(5) Nut

(6) Hex. Bolt

(7) Plate

(8) Crank

(9) Tie Rod

(10) MLS (Control) Valve

11. TOP LINK BRACKET DEVICE

Advertising
This manual is related to the following products: