Generac Power Systems NP-40G User Manual

Page 25

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Section 1.5- COMPONENTS TESTING

TESTING THE CIRCUIT BOARD;

There Is no practical way of testing the CCG

circuit board In the field. Read "SYMPTOMS OF
CIRCUIT BOARD FAILURE" carefully. Test the Sta­

tor, the Genistor, and the Battery Charge circuit as

outlined In this Section. Also perform a resistance

test of the Stepper Motor (see Part 7, "THE VARI­

ABLE SPEED SYSTEM") and observe Its operation

If possible.

Inspect wiring and wiring connections between

the CCG circuit board and the Genistor as follows

(refer to appropriate wiring diagram):

1. Check wires G1 through G4 (and Wire 22) for

proper connections at circuit board and at the

Genistor.
2. Use a VOM to check Wires G1 through G4 (and

Wire 22) for continuity.
3. Check Wires AC1, AC2, SL1 and SL2 (between

circuit board and Genistor) for proper connections.
4. Use a VOM to check Wires AC1, AC2, SL1, SL2

(between circuit board and Genistor) for condlnu-

Ity.

If all tests are completed and no problem Is found

on other components of the system, replace the

CCG circuit board and check unit operation.

Page 1.5-5

Advertising
This manual is related to the following products: