Testing the fuel lockoff solenoid (continued) – Generac Power Systems NP-40G User Manual

Page 73

Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".

Advertising
background image

Section 4.2- SHUTOFF VALVE & REGULATOR

Testing the Fuel Lockoff Solenoid (Continued)

2.

Connect the VOM test leads across Wire 14 (Red) at

the solenoid and a clean frame ground.

3. Set the fuel primer switch on the generator panel to its

ON position.

a. The meter should indicate battery voltage.

b. The solenoid should energize open.

RESULTS OF TEST:

1. If battery voltage is Indicated but the solenoid does

NOT energize, replace the lockoff solenoid.

2. If battery voltage is NOT indicated, a problem exists In

the DC control system. See Parts 6, “ENGINE ELECTRI­

CAL SYSTEM".

Page 4.2-2

Advertising
This manual is related to the following products: