3 test sequence – Nespresso Citiz & Co EF 488 User Manual
Page 142
Citiz service manual
142
F U N C T I O N T E S T S
9.8.3 Test sequence
This test sequence is
not applicable for cof
fee machines with
twowire power cords (with
out ground pin).
Danger of electrocution!
Do not plug in the coffee machine during the protective earth continuity
test.
Read and observe safety instructions in user manual of test equipment.
1) Connect black measuring cable to
ground pin of power plug with an alli
gator clip (example shown: Swiss
power plug).
Symbolic illustration
of test equipment.
2) Switch on test equipment and select
protective earth continuity test.
The coffee machine
Citiz & Co has 2 test
holes to check both
thermoblocks.
Test holes on bottom of Citiz / Citiz & milk / Citiz & Co platforms
3) Insert tip of red test probe in test hole
and touch thermoblock.
4) Press "measure" button and read off
displayed resistance.
The resistance must be lower than
0.3 Ohm.
5) Fill in measured value(s) in a test
report.