3 replacing mains switch, Assembly checkpoints – Nespresso Citiz & Co  EF 488 User Manual

Page 60

Advertising
background image

Citiz service manual 

60 

R E P A I R S 

Assembly checkpoints 

• 

Check that gasket is inserted in water tank connector (53) correctly. 

• 

During assembly of the water tank connector on the platform, each of its 3 latches 
has to engage with an audible click. 

• 

Mind the different diameters of hoses for the water tank connector. 

8.4.3  Replacing mains switch 

• 

Remove water tank connector from platform first (see page 59). 

• 

Remove both insulated faston receptacles from mains switch (54). 

• 

Press blade of screwdriver between holder of mains switch and platform carefully. 
Lift holder with screwdriver slightly. Then press holder with mains switch (54) 
inwards until it can be removed. 

The hoses can 
remain on the water 
tank connector. 

Use a pair of flat pli­ 
ers to pull off insulat­ 
ing sleeve with recep­ 

tacle.

Advertising