Installation, Charging station/tablet, Installation of tablet into the stand bracket – Doremi AccessLink User Manual

Page 19: 3 installation

Advertising
background image

FAL.OM.002372.DRM

Page 19 of 62

Version 1.6

Doremi Labs

3 Installation

Follow the steps below to set up the AccessLink and Fidelio System.

For the connection diagram, please refer to Section 10.

3.1 Charging Station/Tablet

You will need to first connect the touchscreen tablet to the Fidelio

Charging/Configuration Base using the tablet bracket.

3.1.1 Connection of the Tablet Bracket to the Configuration/Charging

Station Base

Place the Fidelio Configuration/Charging Station Base upside down near the edge of a

table so that the Tablet bracket can hang down and sit flush with the bottom of the base.

Line up the four (4) holes of the tablet mounting bracket to the four (4) holes of the

Charging/Configuration Base.

Using a Phillips screwdriver, carefully secure the Tablet Mounting Bracket to the

Charging/Configuration Base using the four (4) M3x6 Black Flat Head Machine Screws
provided.

3.1.2 Installation of Tablet into the Stand Bracket

Turn the Fidelio Configuration/Charging Station Base over so that it is sitting upright.

Loosen the Tablet Clip screws.

Slide the Touchscreen Tablet from the right-hand side of the Bracket grooves until the

Tablet is centered on its mounting bracket.

Tighten the Tablet Clip Screws to secure the Touchscreen Tablet in the bracket (Figure

14).

Advertising