For Vertical Termination:

Measure the distance

from the fireplace flue outlet to the ceiling. Add

the ceiling thickness, the vertical rise in an attic or

second story, and allow for sufficient vent height

above the roof line. You may use one or two 90°

elbows in this vent configuration. See Vertical

Termination Configurations on page 16.
Note:

You may use two 45° elbows in place of a

90° elbow. You must follow rise to run ratios when

using 45° elbows.

For two-story applications, firestops are required at

each floor level. If an offset is needed in the attic,

additional pipe and elbows will be required.

You may use a chase with a vent termination with

exposed pipe on the exterior of the house. See

Installing Vent System in a Chase.

Your DESA direct-vent fireplace has been tested

for a minimum 3' rise with a maximum 11" wall

thickness. Any horizontal application longer than

12" must provide a minimum of one (1) foot of

vertical rise for every three (3) feet of horizontal run.

The maximum horizontal run is 20' with 8' vertical

rise (see Installation for Horizontal Termination).

The maximum vertical run is 30' (see Installation

for Vertical Termination, page 16).
Installing Vent System in a Chase

A chase is a vertical box-like structure built to

enclose venting that runs along the outside of a

building.

NOTICE: Treatment of firestops

and construction of the chase

may vary from building type to

building type. These instruc-

tions are not substitutes for the

requirements of local building

codes. You must follow all local

building codes.

Note:

When installing in a chase, you should

insulate the chase as you would the outside walls

of your home. This is especially important in

cold climates. Minimum clearance between vent

pipes and combustible materials such as insula-

tion is 1".

After framing the chase (see Framing on page 7)

install the vent system by following the installa-

tion instructions.

Figure 16 - Snorkel Termination with

Drainage Pipe

Figure 15 - Snorkel Termination

Snorkel

1' Minimum

90º

45º

Adequate
Drainage

Snorkel

1' Minimum

90º

45°

1"

Minimum

1"

Minimum

INSTALLATION FOR HORIzONTAL
TERMINATION

1. Determine the route your horizontal venting

will take. Note: The location of the horizontal

vent termination on the exterior wall must

meet all local and national building codes and

must not be blocked or obstructed.

WARNING: Do not recess

vent terminal into a wall or sid-

ing. This is a fire hazard.

Snorkel terminations are available for termina-

tions requiring a vertical rise on the exterior of

the building (see Figures 15 and 16). Snorkel

kits are available for rigid pipe applications

only to provide a 14" rise and a 36" rise (see

page 19). Follow the same installation proce-

dures used for standard horizontal terminations.

If installing the snorkel termination to raise the

vent termination from below grade level such

as in a basement installation, you must provide

proper drainage to prevent water from entering

the snorkel termination (see Figure 16). Do not

back fill around the snorkel termination.