For switch test – Xtramus NuStreams-P9M V2.1 User Manual

Page 11

Advertising
background image

11

2.2. For Switch Test

While performing tests on Switch, DUT LAN ports must be connected to NuStreams-P9M with CAT-5
UTP cables as shown in the figure down below.



If both NuStreams-P9M and the DUT are connected with CAT-5 UTP cables correctly,

NuStreams-P9M’s LAN LEDs will be ON according to the test parameter you configured previously.

XTRAMUS TECHNOLOGIES

®

E-mail: [email protected]

Website: www.Xtramus.com

Advertising