Arrange components for installation, Arrange components for installation, se – Flowserve Byron Jackson Type M User Manual

Page 24

Advertising
background image

®

Byron Jackson Double Mechanical Seal Submersible Pumping Unit • 1042.293/9 • June

04

Page 24 of 68

4.4.4

Arrange components for installation

Figure 7 Components arranged for installation

Refer to Figure 7. An orderly arrangement of sub-
assemblies will reduce the installation time.

1. Lay out the parts in order of installation, as

follows:

Motor

Arranged

horizontally.

Pump bowl assembly

Uncrated and arranged horizontally.

Riser pipes

Place all riser pipe sections with coupling
end toward the well.

Check couplings with chain tongs to
make sure they are screwed tight.

Place riser pipe check valve sections so
that each will be installed in the proper
sequence.

Power cable

Wellhead

Tools for installation, see Chapter

4.2

"Equipment and personnel required",
Page 19.

U-plate

2. Record the complete motor serial number

from the motor, see Chapter 3.1.3 "Motor se-
rial number", Page 14.

NOTE Make sure you can always quote each

part's serial number in correspon-
dence and when ordering spare parts
or further accessories.

3.

Check motor rating, horsepower, poles, volts,
and frequency against job requirements.

Advertising