Transport and storage, Consignment receipt and unpacking – Flowserve Byron Jackson Type M User Manual

Page 9

Advertising
background image

®

Byron Jackson Double Mechanical Seal Submersible Pumping Unit • 1042.293/9 • June

04

Page 9 of 68

2

TRANSPORT AND STORAGE

2.1 Consignment receipt and unpack-

ing

A submersible pumping unit consists of

Motor

Pump bowl assembly

Non-return valve

Power cable

Riser pipe (discharge column)

Cable or bracket to fasten the motor power
cable onto the riser pipe

Wellhead (surface plate)

Terminal box or junction box

Tools for installation and maintenance.

NOTE Not all components or sub-

assemblies of a pumping unit are
necessarily supplied by Flowserve
or part of this delivery.

These user instructions apply only
to the components or sub-
assemblies supplied by Flowserve
in this delivery, see Chapter 12
"Scope of delivery".

Flowserve generally ships the pumping unit in two
packages:

Main components described in Chapter 3.1.2
"Main Components", Page 14.

Tools described in Chapter 4.4.4 ”Arrange
components for installation", Page 24.

All components and parts are suitably protective
wrapped, crated or mounted on skids as appropri-
ate.

The motor is shipped nearly completely filled with
oil, with an oil expansion bag (shipping bladder)
mounted outside of the motor to allow thermal ex-
pansion and contraction of the motor oil.

The power cable, if included in the delivery, is
shipped on a reel with a shipping cap or other pro-
tective covering installed to protect the connectors.

Immediately after receipt of the equipment

1.

Uncrate all parts.

Check all crates, boxes and wrappings for any
accessories or spare parts which may be
packed separately with the equipment or at-
tached to side walls of the box or equipment.

2.

Check the scope of delivery.

Check the delivery against the delivery
and shipping documents for its com-
pleteness.

Each product has a unique serial num-
ber. Check that this number corresponds
with that advised.

NOTE

Make sure you can always quote
each part's serial number in corre-
spondence and when ordering
spare parts or further accessories.

Inspect the delivery for transportation
damage.

Immediately report any shortage and or dam-
age to Flowserve and the shipping company.

Claims must be reported in writing within one
month of receipt of the equipment. Flowserve
does not accept latter claims.

3. Check the available power against the re-

quirements given on the motor data plate and
in Chapter 12.2 "Data sheet".

If the equipment is to be stored

continue with Chapter 2.3 "Storage and ship-
ping", Page 12.

If the equipment is to be installed

continue with Chapter 4.4 "Installation",
Page 23.

Advertising