Install motor, Install motor, see cha – Flowserve Byron Jackson Type M User Manual

Page 26

Advertising
background image

®

Byron Jackson Double Mechanical Seal Submersible Pumping Unit • 1042.293/9 • June

04

Page 26 of 68

4.4.6 Install

motor

Transport the motor to the well site, see Chapter
2.2.3 "Transport of the motor", Page 10.

Never step under floating load.

Watch for and avoid overhead ob-
structions including power lines.

1. Install motor U-plate on foundation.

Use to 2 persons to install the
U-plate.

Handle the U-plate carefully.

Danger of injury by dropping the
U-plate onto parts of the body.

2. Cover the U-plate and foundation with a tar-

paulin.

3. Orient the motor horizontally so that the ter-

minal shipping cap is on top.

Remove motor shipping cap (112-1), power
terminal gasket (744-6), nuts (003-8), and lock
washers (690-5). Some oil may be present in
the shipping cap.

Be certain to put the power terminal gasket
(744-6) in a safe area until it can be stored in
the motor shipping cap (112-1).

NOTE

The power terminal gasket is not
used in the unit assembly.

Then remove the tools and the power terminal
gasket (744-10) from the power terminal ship-
ping cap.

4. Reinstall motor shaft shipping cap (112-1),

nuts (003-8), and lock washers (690-5).

5. Lift the motor as described in Chapter 2.2.3

"Transport of the motor", Page 10.

6.

Slowly elevate the motor to vertical position.

7. Center the motor over the well casing open-

ing.

8.

Lower the motor to rest on the U-plate.

Refer to Figure 10.

Figure 10 Motor in place on U-plate

9. Remove motor shipping cap (112-1), nuts

(003-8), and lock washers (690-5).

10. Cover coupling (529 or 531) and shaft with a

clean cloth.

The motor is now ready to receive the coupling.

Advertising