Model IGK Make-Up Air

®

Start-Up Checklist

Unit Model Number ____________________________ (e.g. IGK-112-H15-DB)

Unit Serial Number ____________________________ (e.g. 10111000)

Start-up date ____________________________ (MM/DD/YYYY)

Start-up Personnel Name ____________________________

Start-up Company ____________________________

Phone Number ____________________________

Pre Start-Up Checklist - check boxes as items are completed
o Check tightness of all factory wiring connections
o Verify control wiring wire gauge
o Hand-rotate blower to verify free rotation
o Verify supply voltage to the main disconnect
o Verify the supply gas pressure
o Verify remote controls wiring

Start-Up Blower Checklist - refer to Blower Start-Up section for further detail
o Check line voltage

L1-L2 _________________ L2-L3 _______________ L1-L3 _______________

o Check blower rotation
o Check for vibration
o Supply fan RPM

______________

RPM

o Motor nameplate amps

______________

Amps

o Actual motor amps

______________

Amps

o Actual CFM delivered

______________

CFM

Optional Accessories - refer to Blower Start-Up section, step #6 for further detail
o Heating inlet air sensor

______________

Actual Setting (Typical Setting 60-70º F)

Start-Up Indirect Gas - refer to Furnace Start-Up section for further detail
2 Stage furnace control type
o Check supply gas pressure ____________ Maximum

__________ Minimum

__________ Actual

o Set the High Manifold pressure

______________

Inches wg

o Set the Low Manifold pressure

______________

Inches wg

o Set the unit’s operating temperature

______________

degrees F

Maintenance Start-Up Record