Preheating – Ivoclar Vivadent IPS e.max ZirPress User Manual

Page 25

Advertising
background image

25

Preheating

After the stipulated setting time of the respective investment material (IPS PressVEST or IPS PressVEST Speed), the

investment ring is prepared for preheating as follows:

– Remove the ring gauge with a turning movement.

– Carefully push the investment ring out of the IPS Silicone Ring.

– Remove the ring base with a turning movement.

– Remove rough spots on the bottom surface of the investment ring with a plaster knife. Check the 90° angle. Investment

material residue must not enter the sprues. Blow into the sprues if necessary.

– If several investment rings are preheated together, mark them accordingly.

Setting time

Temperature of the preheating
furnace when placing the invest-
ment ring

Position of the investment ring in
the preheating furnace

IPS e.max ZirPress ingots

IPS Alox Plunger or
IPS One-Way Plunger 300 g

Note

IPS PressVEST

min. 1 hour, max. 24 hours

Room temperature max. heating

rate 5 °C/9°F/min. to 850°C/1562 °F

towards the rear wall, tipped with the

opening facing down

no preheating

no preheating

IPS PressVEST Speed

min. 30 min., max. 45 min.

850 °C (1562 °F)

towards the rear wall, tipped with the

opening facing down

no preheating

no preheating

If several Speed investments are to be

conducted, they should be invested

consecutively and placed into the

preheating furnace at an interval of

approximately 20 minutes. Make sure

that the furnace temperature does not

drop too much when placing the

investment rings into the preheating

furnace. The stipulated holding time

counts from the point when the pre-

heating temperature has been reached

again.

towards the rear wall, tipped with the opening facing down

Do not preheat the ZirPress ingot and Alox plunger.

C

li

n

ic

a

l

S

te

p

s,

F

ra

m

e

w

o

rk

P

re

p

a

ra

ti

o

n

,

C

o

n

to

u

ri

n

g

,

P

re

ss

in

g

P

ro

ce

d

u

re

Advertising