Nortec GS Series User Manual

Page 42

Advertising
background image

39 | GS Series Installation

Table 7: GS Inspection Check List

Humidifier Mounting

Verify proper clearances around the unit.

Humidifier mounted level.

Humidifier properly secured to stand and stand bolted to floor.

All service doors accessible.

Roof curb sized correctly (Outdoor Model Only).

Gas Piping

Correct gas line size installed.

Certified manual shut off valve and union installed.

Sediment trap installed.

Gas piping leak tested.

Air purged from lines.

Proper gas supply pressure.

Regulator dedicated for each gas unit.

Exhaust Gas Venting

Comply with local regulations.

Proper venting materials used (B or BH) – refer to gas codes.

Maximum vent length of 100 feet (70 feet for direct vent models).

Proper pipe diameter used.

Condensate tee installed.

Steam Lines

Slope up 2” per 12”

Sloped back to drain

Slope down ½” per 12”

Trapped 2” more than static duct pressure

Traps size ____________

Insulated

Length/Size ____________

90 deg. Elbows qty: ____

45 deg. Elbows qty: ____

Can condensate be trapped anywhere in the steam line? yes ___ no ___

Condensate Lines

Sloped back to drain

Trap is greater than 2” duct static pressure

Size of trap____________

Supply Water Line

Nortec supplied adapter installed on fill valve (½”NPT)

Manual shut off valve and union installed

Verified pressure (30 – 80 psig)

Water source of 10 l/min (2.6 gpm)

Leak tested

½” dia. At max 4ft of the unit

Advertising