Quick set-up, Connect to craft port, Connect to craft port -1 – Verilink NCC 2020 (880-503284-001) Product Manual User Manual

Page 15: Chapter

Advertising
background image

Verilink NCC 2020 User Manual

2-1

Chapter

2

Quick Set-Up

This section details a quick, step-by-step procedure for configuring
the NCC 2020. For this quick configuration guide, the following
assumptions are made:

That you are using the NCC 2020 with a single DIU 2130 DSU
module in a Dual-line shelf.

That you are dividing the bandwidth of an ESF/B8ZS T1 evenly
between the two data ports of the DIU 2130.

That one of the data ports is used for a router and the other
data port is for a time-division multiplexer.

Figure 2-1 Example Configuration

It is most likely that this procedure will not match your
configuration exactly. Use this chapter as a guide to the process of
installing your equipment. Chapter 3 provides complete details on
configuration covering all selectable options.

Connect to Craft

Port

Using the Craft cable supplied with the NCC 2020, connect the
modular (RJ-11) end to the port labeled C

RAFT

on the front panel of

the NCC 2020. Connect the other end of the Craft cable to your PC
or terminal. If your PC has a DB-9 COM port connector, use a
standard PC-AT serial cable to complete the connection.

Set your terminal, or terminal program, to 19.2 kbit/s, 8 data bits,
no parity, one stop bit, and no flow control.

Time Division

Multiplexer

Router

Dual-line Shelf

NCC 2020

DIU 2130

Network Service

Provider

Advertising
This manual is related to the following products: